तकनीकी परिपत्र एवं आदेश
Urban water supply schemes & Construction of over head tanks
- Regarding the use of the primary products of the Reinforcement Steel in the construction works
- Failure to be taken regarding the safety of the failed Nalkupo Main Holes Avila Grade 03-03/2009
- Regarding making RCC-C-ladder up to full height in the construction of RC-C- high level tank. Dated 31-1-2009
- Due to extreme delays in drawing and design approval of various construction works. Date 24/11/2008
- Under the water supply schemes, prior to the construction of a high level tank, Date 19/11/2008
- Dated 14/07/08 due to deduction on the basis of rate analysis
- Regarding giving technical approval of the works. Date 05/07/2008
- The need to keep alerts in the works of sewer lines and sewer chambers, 18/06/2008
- Unusual C.I. and D.I. Date of Information 24/11/2005
- Regarding making a plan only after the availability of the source for urban water supply scheme and drainage scheme, date 17/10/2005
- Administrative sanction of revised water supply schemes dated 13/10/2005
- Changed in General Program from Accelerated City Water Supply Scheme dated 13/10/2005
- Drawing approval of works done by department and cube test dated 14/7/2005
- Summary / checklist for the preserved administrative sanction of the schemes dated 22/06/2005
- Effective implementation of urban water supply schemes 25/5/2005
- Determination of the amount of compensation from the delay of construction work dated 19/4/2005
- Guidelines for broad production work dated 26/12/2003
- Man Hole's Chambers for Sewage Clearance Plans, Created on 1/9/2001
- Dated 6/1/2001 regarding relocation of water supply schemes
- Department for supervision of schemes, supervision fee dated 08/12/2000
- Per capita water supply in urban areas dated 21/11/2000
- Construction of RCC high level overhead tanks dated 21/8/2000
- Supervision duty on the works of local bodies or other government departments dated 5/11/1997
- Supervision duties on works of local bodies or other government departments dated 24/02/1997
- RCC High Level Tanks Created on 9/11/1993
- Date of 23/9/1993 regarding the installation of iron mesh on the pipe face
- Regarding administrative sanction of water supply scheme summarized date 2/2/1993
- Low population municipalities grant date 31/03/1986 for the water supply 20000
- Grant for water supply to municipalities with less than 20000 population dated 31/3/1986
- Formulation and construction of RCC level tanks